Installation of car windows started today and first of cars (the Lahti car) got already all of its windows installed. At the same time some priming was made on the newly installed metal end platforms of the car bodies. Also similar to original ventilators were installed to carriage roof
The next phase will be the teak staining and lacking of the indoor plywood walls and ceiling.
A picture of the car
(you can get to the gallery by clicking the thumbnail)
{webgallery}
{/webgallery}