The next big step was to remove the locomotive cab. Now the work is over and the cabin is detached and lifted by a shop crane next to the locomotive. Most of the dismantling work has now been done and the actual repair of the locomotive can begin.

The stripped steam locomotive frame in the workshop with a blue locomotive cab next to it.
The locomotive's cab is detached from the frame and lifted by a shop crane next to the locomotive. Photo: Tuukka Selkälä 28.11. 2020.