During the past summer and autumn the work on Tubize has continued when there has been time for it. Different kind of piping and valves have been installed and boiler prepared for the installation of a sheet metal boiler jacket. TThat installation is scheduled for year 2016.

photo of a steam locomotive cab

side of a steam locomotive boiler